Electrical lines and substations are mainly built on the selection of the technology and routes, the functional description of equipment adapted to needs, the design and engineering studies, the construction supervision and finally the commissioning. These are stages that condition the cost, operation, quality of supply and life cycle of the electrical lines and substations – Sender Services Company has operated many of substations and hundreds of kilometers of lines in high voltage. Thanks to its wide experience and knowledge.

Construction of Distribution System to supply Lwanda Tuk Market ,Kibusi Secondary ,Ndiwa Market – Nyatike Constituency.  The Project amount – Ksh 3,053,519.19/=

Construction of Distribution System to supply Chepkemel Kipngotet Osorongai Primary and Secondary Schools,and Dispensary – Eldoret North Constituency

  • Construction of 8.2 km of 33kv three phase line
  • Installation of 3 x 50 kva three phase transformers
  • Construction of 1.7 km of single phase line/three phase low voltage line in 50mm sq AA conductor.
  • The Project amount is Ksh 1,379,720.30/=

Construction of the Distribution System to supply Busende Secondary School – Nambale Constituency

  • 6 km of 33 kv lines
  • 1 x 50 KVA single phase transformers
  • 0 km low voltage line in 50/100mm sq AA conductors
  • Installation of single phase and 0 three phase service cables
  • The project amount is Ksh 332,385.10/=

Construction of Distribution System to supply Number-1-Okana Market – Nyando Constituency

  • Construction of 3.4 of 11 KV three –phase line
  • Installation of 1 x 50 KVA, 11/.433KV three phase transformers.
  • Construction of 4.4 km of Three 1 phase line
  • The project amount is Ksh 677,239.44/=

Construction of Distribution System to supply Mbogo Valley ,Dispensary – Tinderet Constituency

  • Construction of 7.55 of 11 kv .433kv
  • Installation of 2 x50 Kva of 11 kv three phase transformers
  • Construction of 0.7 km of single phase line /three phase low voltage line in 50 mm
  • The project amount is Ksh 1,069,060.76/=

Construction of Distribution System to supply Simbi Dispensary,Kokwon Primary school,Chelugotet – Sotik Constituency. The project amount is Ksh 1,012,809.86/=

Construction of the Distribution system to supply Sugumerga Market,Secondary and Dispensary – Chepalungu Constituency. The project amount is Ksh 1,559,724.41/=

Construction of the Distribution system to supply Mortiret Secondary and Oldebesi Market. The project amount is Ksh 726,999.14/=

Construction of the Distribution system to supply Opar Siriwe TC ,Sirinde Primary – Completed. The project amount is Ksh 741,000.51/=

Construction of the Distribution System to supply Ayier Chiefs Camp/Wibolo Market. The project amount is ksh 1,092,060.76/=

Construction of the Distribution system to supply Gekonge Dispendary/Secondary, Nyambogo Youth Polytechnic. The Project amount is Ksh 988,878.89/=

Professional HandyMan

Founded on a sound base with three directors and highly technical people who are experienced locally and internationally .

24/7 Services

We trust that our experience and dedication to our client’s wishes will form a solid basis for future relationship for mutual benefit.